Zhejiang Guanhao Power Transmission and Distribution Co., Ltd. is a leading manufacturer of innovative power solutions, specializing in an extensive array of package substations designed for exceptional performance. These units primarily consist of a transformer unit, high voltage unit, and low voltage unit. The robust shell material options include stainless steel, aluminum alloy, cold-rolled plate, and non-metal materials, ensuring durability and longevity. Known as Prefabricated Substation, this European-type transformer substation sets a benchmark in electrical engineering.
This substation embodies the pinnacle of electrical innovation, capable of executing transformation, distribution, transmission, measurement, compensation of electrical energy, system control, and protection, along with advanced communication capabilities. It features three meticulously designed compartments: the High Voltage Compartment (equipped with high/medium voltage switchgear such as the ring main unit and gas-insulated switchgear, with a rated voltage reaching up to 40.5kV maximum), the Low Voltage Compartment, and the Transformer Compartment (featuring a three-phase oil-immersed transformer or a cast resin dry-type transformer).
This substation is a critical power distribution unit within the electrical cable power network, ensuring consistent and reliable energy delivery. It is a comprehensive power supply solution, offering high-voltage controlling, protection, conversion, and distribution, adept for use in three-phase AC with 50Hz and a maximum rated current of 1600KVA transformers. It finds extensive applications in industrial and mining enterprises, as well as residential quarters, hospitals, malls, high-rise buildings, and various other distribution systems, exemplifying versatility and efficiency. The compact prefabricated substation represents one of the most effective, convenient, and economical solutions available. It is renowned for its safety, ease of operation, and user-friendly nature, making it an ideal choice for modern substations.
Working Environment
1. Ambient temperature: -25ºC to +40ºC, ensuring adaptability to diverse climatic conditions.
2. Altitude: Suitable for installations not exceeding 1000m, accommodating a wide range of geographical locations.
3. Relative humidity:
Daily average less than 95%, with the average water vapor pressure not exceeding 2.2kPa,
and a monthly average less than 90%, ensuring a maximum average water vapor pressure of less than 1.8kPa.
4. Seismic intensity: Designed to withstand seismic activity of less than magnitude 8,
5. Withstanding external wind speeds of up to 35m/s,
6. Installation sites should be free from fire hazards, explosive threats, and chemical corrosion, guaranteeing optimal safety and performance.
We offer customized substation production tailored to meet customer specifications, ensuring precision and satisfaction in meeting unique requirements.
Product Parameters
Detailed Photos
FAQ
1. Are you a trading company or manufacturer ?
We are a dedicated and professional factory boasting a decade of experience in the realm of High and Low Voltage switchgears, Substations, transformers, cable distribution boxes, and an array of cutting-edge electrical equipment such as vacuum circuit breakers and load break switches.
Our factory proudly stands as an exemplary supplier to the State Grid Corporation of China.
2. Do you accept customized service ?
Absolutely! We offer comprehensive OEM/ODM services, including the option to emblazon your logo on our products. Our skilled and dedicated technical and quotation team will deliver a project that meets your specifications based on your drawings and parameters.
3. What is your MOQ?
Our minimum order quantity is just 1 piece, ensuring flexibility for your needs.
4. How long is your delivery lead time ?
Delivery lead times vary according to your specific product requirements and order quantity. Typically, you can expect availability within 5 to 10 working days.
5. How do you solve quality problems?
Please provide detailed photographs of any quality issues. Our expert technical and quality testing departments will conduct a thorough analysis and deliver a satisfactory solution within 2 days.
6. What are your payment terms ?
Our payment terms are 30% T/T in advance, with the remaining 70% due before shipment. We also accept payment via West Union and L/C.