Advanced Substation Solutions for Efficient Power Distribution Systems

Product Details
Customization: Available
Type: Yb
Structure: Fixed Board
Still deciding? Get samples of US$ 10000/Piece
Request Sample
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
to see all verified strength labels (19)
  • Advanced Substation Solutions for Efficient Power Distribution Systems
  • Advanced Substation Solutions for Efficient Power Distribution Systems
  • Advanced Substation Solutions for Efficient Power Distribution Systems
  • Advanced Substation Solutions for Efficient Power Distribution Systems
  • Advanced Substation Solutions for Efficient Power Distribution Systems
  • Advanced Substation Solutions for Efficient Power Distribution Systems
Find Similar Products
  • Overview
  • Product Parameters
  • Detailed Photos
Overview

Basic Info.

Model NO.
YB
Certification
ISO9001:2000, CCC
Form
All- packaged Type
Operation Voltage
High Voltage
Size
3 Uint
Application Range
Power Distribution
Shell Material
Aluminum Alloy
Shell Protection Grade
IP30
Brand
Guanhao
General Structure
High Voltage/Transformer / Low Voltage Unit
Ambient Temperature
-25degree Centigrade~+40degree Centigrade
Altitude
No More Than 1000m
Feature
Great Flexibility, Small Volume, Low Cost, Rapid
Transport Package
Impact - Resistant Plastic Packaging
Specification
3400*2200*2650
Trademark
GHGH
Origin
China
HS Code
8537209000
Production Capacity
100pieces/Weeks

Product Description


Zhejiang Guanhao Power Transmission and Distribution Co., Ltd. proudly manufactures a diverse array of package substations that primarily include transformer units, high voltage units, and low voltage units. These substations boast enclosures made from premium materials such as stainless steel, aluminum alloy, cold-rolled plates, and non-metal materials. Commonly referred to as the European type transformer substation, the Prefabricated Substation is designed to deliver exceptional performance and longevity.
This state-of-the-art substation is fully equipped to perform an array of functions including the transformation, distribution, transmission, measurement, and compensation of electrical energy. Additionally, it offers advanced system control, protection, and communication capabilities. Typically, the substation is divided into three main compartments: the High Voltage Compartment, featuring high/medium voltage switchgear like the ring main unit and gas insulated switchgear with a maximum rated voltage of 40.5kV; the Low Voltage Compartment; and the Transformer Compartment, equipped with either a three-phase oil-immersed transformer or a cast resin dry type transformer.


This substation serves as a critical power distribution unit within the electrical cable power network, ensuring reliable and efficient electricity supply. It represents a complete power supply solution with high voltage control, protection, conversion, and distribution capabilities. Ideally suited for 3-phase AC systems at 50Hz with a maximum rated current of 1600KVA, it's widely utilized in industrial and mining enterprises, residential communities, hospitals, shopping malls, high-rise buildings, and a variety of other distribution systems. The compact prefabricated substation is recognized for its effectiveness, convenience, and economic efficiency, providing a user-friendly solution that is safe and straightforward to operate.


Operational Environment
1. Ambient Temperature: Ranges from -25ºC to +40ºC
2. Altitude: Not exceeding 1000 meters
3. Relative Humidity:
Daily average below 95%, with the average water vapor pressure less than 2.2 kPa
Monthly average below 90%, with the average water vapor pressure less than 1.8 kPa
4. Seismic Intensity: Less than magnitude 8

5. External Wind Speed: Less than 35 m/s
6. Installation Location: Suitable for areas free from fire hazards, explosion risks, and chemical corrosion.


We are equipped to customize this substation to meet any customer's specifications, following their drawings and specific needs.
Product Parameters

Advanced Substation Solutions for Efficient Power Distribution Systems
Detailed Photos

Advanced Substation Solutions for Efficient Power Distribution SystemsAdvanced Substation Solutions for Efficient Power Distribution SystemsAdvanced Substation Solutions for Efficient Power Distribution SystemsAdvanced Substation Solutions for Efficient Power Distribution SystemsAdvanced Substation Solutions for Efficient Power Distribution SystemsAdvanced Substation Solutions for Efficient Power Distribution SystemsAdvanced Substation Solutions for Efficient Power Distribution SystemsAdvanced Substation Solutions for Efficient Power Distribution Systems
Advanced Substation Solutions for Efficient Power Distribution Systems

FAQ

1. Are you a trading company or manufacturer?
We are a distinguished professional factory boasting a rich decade of experience in the dynamic field of high and low voltage switchgears, substations, transformers, cable distribution boxes, and an array of electrical equipment, including top-tier vacuum circuit breakers and load break switches.
Our factory stands as a proud and excellent supplier to the esteemed State Grid Corporation of China.

2. Do you accept customized services?
We proudly offer exceptional OEM/ODM services, allowing you to personalize your products with your logo. Our team of seasoned technical and quotation experts is dedicated to crafting a project that perfectly aligns with your specific drawings and parameters.
3. What is your MOQ?
Our minimum order quantity is a singular piece, ensuring flexibility in meeting your needs.
4. How long is your delivery lead time?
The delivery lead time is contingent upon your precise product requirements and order volume. However, a general timeframe of 5 to 10 working days is typically achievable.
5. How do you solve quality problems?
Kindly provide detailed photographs of any quality issues. Our dedicated technical and quality testing departments will conduct a thorough analysis and deliver a satisfactory solution within two days.
6. What are your payment terms?
Our payment terms include a 30% T/T in advance and 70% before shipment. Additionally, we accept West Union and L/C for added convenience.









Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier